📍Project Summary – Erection Activity Using SANY STC 800, F15 Farana & Hydra
🛠️ Scope of Work:
The erection activity involved the safe and precise lifting and installation of [A heavy beam, vessel, truss, or equipment] using a combination of mobile cranes:
-
SANY STC 800 (80-ton truck-mounted crane)
-
F15 Farana (15-ton pick-and-carry crane)
-
Hydra (12/14-ton pick-and-carry crane)
The operation required careful planning, coordination, and execution due to limited working space, load distribution requirements, and high precision alignment.
🔩 Equipment & Roles:
-
SANY STC 800 handled the main lift, providing high lifting capacity, extended boom outreach, and stability for vertical placement.
-
F15 Farana assisted in load orientation and tailing, ensuring proper balance and movement control.
-
Hydra crane supported secondary adjustments and alignment at ground level and final positioning.
All lifting activities were carried out under the supervision of certified rigging personnel and in compliance with safety protocols.
⚙️ Key Technical Details:
| Equipment | Capacity | Application |
|---|---|---|
| SANY STC 800 | 80 Tons | Primary lifting & hoisting |
| F15 Farana | 15 Tons | Tailing & load maneuvering |
| Hydra | 12–14 Tons | Positioning & alignment |
-
Lift Weight: [Insert actual weight of lifted item]
-
Boom Configuration: [Insert boom length & angle, if known]
-
Rigging Method: [Insert method – e.g., 2-leg sling, spreader bar, etc.]
-
Ground Conditions: Verified & leveled before crane setup
-
Safety Measures: Barricading, spotters, tag lines, communication systems in place
✅ Outcome:
The erection was completed safely, on schedule, and without incident. The multi-crane operation allowed for precise handling of the component, reducing downtime and ensuring structural integrity during installation.